All metros
hurricane risk · June – November

Tampa, FL storm damage roofing guide

Tampa Bay took Helene and Milton within two weeks in autumn 2024 and that work is still moving through the claim system. Tampa builds to the 2023 Florida Building Code: the 25% rule, hurricane straps and a secondary water barrier all attach to a re-roof and are frequently missing from an initial scope. Florida §626.9744 addresses matching. Confirm requirements with the specific authority having jurisdiction — Hillsborough, Pinellas and the incorporated cities do not all enforce identically.

0.6
Hail days/yr
8
Wind days/yr
395K (metro 3.3M)
Population

Recent major storms

  • October 9, 2024
    Hurricane Milton, 120mph winds
  • September 26, 2024
    Hurricane Helene, storm surge + 100mph winds
Code adoption

Tampa adopts Florida Building Code 2023. 25% rule, hurricane straps, and secondary water barrier mandatory on re-roofs.

Confirm with the authority having jurisdiction — local amendments vary inside the metro.

Check these against a first scope
  • · Secondary water barrier on the re-roofed deck (Florida Building Code).
  • · Hurricane strap / roof-to-wall connection verification at re-roof.
  • · The 25% rule: a repair over 25% of the roof area triggers a full code-compliant re-roof.
  • · Detach and reset of accessory items — vents, gutters, satellite, solar — where the slope is replaced.

Top carriers in Tampa

  • · Citizens
  • · Universal
  • · State Farm Florida
  • · Heritage

Tampa storm claim questions

When is storm season in Tampa, FL?
Tampa's primary peril is hurricane and the active window runs June – November. The metro averages roughly 0.6 hail days and 8 damaging-wind days per year.
What building code applies to a re-roof in Tampa?
Tampa adopts Florida Building Code 2023. 25% rule, hurricane straps, and secondary water barrier mandatory on re-roofs. Confirm the requirement with the authority having jurisdiction before you finalise a scope — adopting authorities and local amendments vary inside the metro.
Which code requirements should I check against a Tampa carrier estimate?
Secondary water barrier on the re-roofed deck (Florida Building Code). Hurricane strap / roof-to-wall connection verification at re-roof. The 25% rule: a repair over 25% of the roof area triggers a full code-compliant re-roof.
RoofGenius AI

Audit a Tampa carrier estimate in 60 seconds.

Upload a closed Tampa claim and our AI identifies line items the scope is missing and generates a supplement letter cited to FL statutes and IRC code.